Enel Group is a multinational company, leader in the world of renewables, innovation, and social responsibility. A number of assets are built using large amounts of concrete and when these are decommissioned, it is vital to find innovative and sustainable ways to reuse or recycle the concrete in a manner that is environmentally conscious. 

 

OVERVIEW

Concrete is known as the most widely used construction material in the world, but also as a major contributor to climate change. The chemical and thermal combustion processes involved in the production of cement, a key input for concrete, are a large source of carbon dioxide (CO2) emissions. Each year, more than 4 billion tons of cement are produced, accounting for around 8% of global CO2 emissions.

Enel is committed to a global net zero strategy - net zero CO2 emission by 2040 - which requires a very fast energy transition with a significant growth in renewable generation, and together with it, the phase-out of several fossil fueled facilities across the world.

This has also led to increased awareness of the importance of developing sustainable practices and standards for decommissioning. 

One of the most relevant issues we are going to face is the production of huge quantities of concrete rubble coming from the decommissioning process of Enel assets. Nowadays only a small portion of the dismissed concrete gets reused for other applications, hence the Enel Group is looking for the best available methods to recycle and/or reuse the materials coming from the demolition of concrete in our plants in a sustainable and circular way. 

Description

SCENARIO 

Reuse or recycling of all the materials that come from the concrete decommissioning has the potential to produce value, both internally and externally, and reduce its environmental impact, while eliminating the need to dispose the rubble to external sites. It is crucial, in this scenario, to search for innovative solutions and circular business models aimed to make the reuse of concrete from decommissioning more sustainable and to postpone the End Of Life (EOL) of concrete, minimizing its impact on climate change. 

 

BACKGROUND

As mentioned above, the estimated quantities of decommissioned concrete for Enel are significant. Here below are mentioned the two main use cases thought for Enel to be extended at Global level.

First use case:

  •  There are several sites listed for phase-out (more than 30 only in Italy), which are estimated to generate more than 1000 ktons of concrete in the next 5 years (800 estimated in Italy).
  • The concrete is coming mainly from the demolition of buildings (turbine hall, auxiliary buildings, etc.), above ground foundations (tanks basements rings, etc.), and only in rare cases foundations below zero quota, (foundations, retaining walls, etc.)
  • At the moment, the dismissed concrete is used especially in presence of depressed areas to be filled. The material is characterized, separated from iron steel bars, crushed and recovered on-site for filling the voids resulting from demolitions. Otherwise, it is disposed of or, in case of inert concrete, sent to off-site facilities for recovery as filling of roads.
  • The dismissed material has the following characteristics: if there is no crushing, the size of the pieces is about 20-30 cm, a suitable size to be able to load it on a truck and compact the space as much as possible. 
  • No additional treatment is foreseen at site in case of disposal. 
  • Enel locations, where this material will be mainly available, are concentrated in Italy and Spain.

 

Second use case:

  • The concrete is coming mainly from the demolition of reinforced concrete poles, reinforced concrete secondary substations and poles’ foundations.
  • At the moment, the dismissed concrete is strongly suggested to be reused, but demolition is entrusted to companies that are paid a decommissioning value to bring the concrete to the landfill; hence there is no visibility into the recycling process.
  • The dismissed material has the following characteristics:
    • Pole Heights: from 9 m to 14 m. The diameter of the section varies from 200 mm to 400 mm.
    • Foundations from 1x1x1 (m) up to 2.7x3.1x3.1 (m)
    • Secondary substations
      • Width=1600 mm x Depth=2000 mm x Height=1800 mm (minimum)
      • Width=2300 mm x Depth=5530 mm x Height=[min. 2300 to max. 2600] mm (maximum)
      • Ceiling and walls thickness is 9/11 cm

 

THE CHALLENGE

Enel is seeking an innovative, cost-effective, and environmentally friendly solution to reuse or recycle the concrete coming from the demolition of our plants within the framework of circularity and sustainability. The proposed opportunity must be applicable at a local level, minimizing the impact of transportation and logistics, and should be a low-intensity process to limit the emissions of CO2. Solutions may focus upon either scenario described above.

 

SOLUTION REQUIREMENTS

Submissions should address the following Solution Requirements

The proposed solutions must:

  • Be ready to use: the practice must have some applications at the global level and the ability to be applied at the local level in Italy or Spain.
  • Be sustainable: the solution must positively affect the environment and the community, considering the impacts upstream and downstream, and the life cycle assessment (LCA). 
  • Maximize the use of secondary materials, minimize the use of water and greenhouse gas (GHG) emissions.
  • Address local opportunities for reuse and recycle, in order to avoid or minimize the impact of transportation for long distances due to the big quantities of material.
  • Be able to deal with large amounts of material in terms of volumes and weights.
  • Be feasible, simple, smart, fast to apply, which translates to having the minimum number of processing steps from the collection until the new use.
  • Be innovative, which means different from the following practices: 
    • Filling of the voids resulting from demolitions
    • Filling of roads
    • Recovery of aggregates for inert material

 

Moreover, the solution should

  • Be scalable, with possible deployment on a global scale, hence following the best practices in terms of handling and disposal regulations.
  • Be in compliance with the Italian/Spanish regulations in terms of waste handling and disposal, treatment, recovery, etc.
 

PROJECT DELIVERABLES

The submitted proposal should include the following:

  • (Required) Detailed description of the proposed solution that includes at least: 
    • The scope of the reuse or recycle process
    • Details on the characteristics and requirements of the waste material that can be used for the process: size, shape, legislations, compositions (Gravel, Sand, Cement, Metal, Water, …), amounts
    • A description of the chemical/mechanical/physical processes involved
    • Details on the materials/components streams resulting from the process 
    • Indication of the use that the materials/components resulting from the process are intended for, whether they can be used internally or externally of Enel sites.
    • Estimation of the environmental impact of the process: emissions, materials/streams to be disposed, chemicals to be used, water demand, etc.
    • Description of a proposed business model and associated economics for project implementation with Enel 
    • Applicable legislation and evidence of how this will be addressed
     
  • Desired information:
    • Description of the necessary infrastructure, logistics of the process
    • List of partners and third parties involved, if any
     
  • Address as many of the following key performance indicators (KPIs) as possible:
    • Tons of material that can be treated per year: t/day
    • Tons of material recoverable/tons of material treated 
    • Water required by the process: kg/kg concrete treated
    • CO2 produced by the process: Kg Co2 eq/Kg concrete treated 
    • % of concrete reused/recycled
    • % of secondary materials used in the process
    • Chemicals used in the process: kg/kg concrete 
    • Flexibility of the solution – range of applicability: % of material (Gravel, Sand, Cement, Metal,…) required
    • Waste production from the process (kg/kg treated)

 

The proposal should include a summary where the Solver explains the rationale of the idea and how it responds to the solution requirements as well as a list of references, articles, patent information (if any) with respect to the Solver’s idea.

The proposal should not include any personal identifying information (name, username, company, address, phone, email, personal website, resume, etc.) or any information the Solvers may consider as their Intellectual Property they do not want to share.

 

SDGs

This challenge provides contribution to the following sustainable development goals (SDGs) to transform our world:

  • SDG 7: Affordable and Clean Energy
  • SDG 9: Industry, Innovation and Infrastructure
  • SDG 11: Sustainable Cities and Communities
  • SDG 12: Responsible Consumption and Production
  • SDG 13: Climate Action
  • SDG 17: Partnerships to achieve the Goal
{{item.title}}

Challenge rules

All proposers are invited to read carefully the Challenge and the Regulation of this Challenge, attached below in the Attachments section, before submitting a solution.

By submitting a solution they automatically accept the attached Regulations other than the Terms of Use of this platform.

 

Eligibility

Except for the people involved in the organization and management of the OPEN INNOVABILITY® CHALLENGE and their spouses or partners and their relatives up to the fourth degree calculated according to Italian law, the proposals could be submitted by all the employees working in the legal entities pertaining to the perimeter of Enel Green Power and Thermal Generation and Enel Grids worldwide.

Without prejudice to the article 5.5 of the Terms of Use, the obligation to grant the IP rights set in this article does not apply if the winning solution is proposed by an employee of an Enel company, unless the employee is the owner of the solution according to the relevant national law.

Explain your proposal clearly in English, attach documents (max 5 files, 35MB total size) if needed.

 

Challenge, award, IP rights

This is a Theoretical Challenge, which requires only a written proposal to be submitted. The Challenge award will be contingent upon theoretical evaluation of the submission by the Seeker.

To receive an award, the Solvers will not have to transfer the exclusive IP rights to the Seeker. Instead, Solver will grant to the Seeker a non-exclusive license to practice their solutions.

 

Deadline

Submissions to this Challenge must be received by 11:59 PM (Central European Time) on October 9, 2022. 

Late submissions will not be considered.

Specific regulation in the CSA attached at the bottom of this page.

Regulation

Concrete reuse - Regulation

PDF (0.16MB) Download

What happens next?

Enel will evaluate the proposal using the following criteria:

  • Overall scientific and technical feasibility of the proposed solution;
  • Economic potential of concept (e.g. Total Cost of Ownership);
  • Business potential for Enel;
  • Novelty and creativity;
  • Potential for proprietary position (i.e., is the technology novel or protectable);
  • User's capabilities and related experience;
  • Realism of the proposed solution;
  • Maturity level of the proposal.


In case the reward includes "Collaboration with Enel", once suitable solution/s have been identified, Enel will reserve the opportunity to start a collaboration, by way of example, all or part of the following activities:

  • Test execution;
  • Supply of prototypes (if an equipment);
  • Installation and site tests;
  • Follow up and monitoring of the proposed idea behavior.


Upon completion of the evaluation, you will receive feedback. In case of success, an Enel contact person will get in touch with you to discuss the next steps.

The final award for this Challenge is contingent upon satisfactory completion of the verification process, including acceptance of the Challenge-Specific Agreement (CSA) that is the regulation for this Challenge.
The verification process includes obtaining the following from the Solver: signed affidavit (based on the CSA), employee waiver (if applicable), proof of identify, and Counterparty Analysis Questionnaire (CAQ).

 

ABOUT WAZOKU CROWD

Wazoku Crowd collaborates with Enel to manage this Challenge.
Imagine a world where any problem you have can be looked at by millions of expert, motivated eyes. The Wazoku Crowd makes this possible. With twenty years of experience in crowdsourcing, the Wazoku Crowd is the gold standard for open talent and external innovation solutions. Commercial, governmental and humanitarian organizations engage with the Wazoku Crowd to solve problems that can impact humankind in areas ranging from the environment to medical advancements.

Attachments

Concrete reuse - Regulation

PDF (0.16MB) Download

Contact us

{{content.helpText}}
{{content.helpText}}
{{content.errorMessage}}
{{content.helpText}}
{{content.helpText}}
{{content.errorMessage}}
{{content.helpText}}
{{content.helpText}}
{{content.errorMessage}}
{{ (returnValue && returnValue.label) ? returnValue.label : returnValue }}
Select Contact reason
{{value.length}}/{{content.max}}
{{content.errorMessage}}
{{content.helpText}}
{{formError.errorMessage}}